Power
Al Reem Island is catered by 1 main grid, which provides 2000 MVA and 6 primary substations, 4 of which provide a capacity of 320 MVA and an operating capacity of 240MVA.
Natural Gas
The natural gas network on Al Reem Island comprises 16-bar and 4-bar networks, providing all buildings in Al Reem Island with natural gas.
Potable Water
The development consists of a regional main PW distribution network, including interfacing with TRANSCO water transmission pipelines that cater to the PW demand for the entire island’s needs.
Recycling for a Greener Future in Al Reem Island
District Cooling
A centralized system, supplying buildings in Al Reem Island with chilled water for cooling purposes. It is the latest state-of-the-art technology which ensures benefits to the end users and provides a sustainable environment.
Irrigation Water
Irrigation water in Al Reem Island is designed to utilize recycled water. The design of the infrastructure comprises the latest technological international standards and authorities’ requirements.
Sewerage
The sewerage water generated from the island is discharged out the island through sewerage pumping station built by ADSSC. Al Reem Island then receives the treated and recycled water for the irrigation network and district cooling.
Ensuring 24/7 Security on Al Reem Island
Bunya appointed a private security company on Al Reem Island for different security tasks. Those include but are not limited to patrolling for surveillance of the public realm around the clock 24×7 daily, weekly, and monthly health and safety monitoring on all infrastructure projects and monitoring the assets and activities on Al Reem Island.
Al Reem Island Environmental Compliances
Bunya appointed a third-party consultant to carry out environmental auditing surveys to determine the environmental compliance level of all the under-construction projects. This is required until the completion of projects as required by EAD in compliance with the environmental impact assessment and preliminary construction environmental management plan.
Infrastructure Projects
Transportation
More than Dh11 billion has been earmarked for investment in regional and local infrastructure projects on Al Reem Island. This amount excludes innovative solutions such as the planned multi-layered public transport network systems on the island. Bunya is constructing the main regional infrastructure on the island, which will crisscross through the light trail system and interconnect its various districts, including the traffic signalling systems.
This will enable utilities to be quickly and easily installed and ready for all three master developers and their third-party developers.


Cyclist and Walking Routes
The element in the urban context provides the characteristics of a walkable community concept. All internal roads are designed in such a way as to encourage and allow the maximum pedestrian activities. Internal roads will include dedicated or shared bicycle lanes to encourage residents to travel by riding bicycles.
Application for No Objection Certificate
It is mandatory to obtain the necessary approvals from the respective authorities and master developers through Bunya (as per the standard requirements).
Application for No Objection Certificates (NOC) shall be submitted to Bunya as per the guidelines, and the NOC will be issued for all works, services, events, activities, etc., to be carried out within ARI.